Use digital technology to optimise planning, logistics and cooperation in switch replacement projects. Problem description
Maintenance projects in areas with intense traffic or urban environments often present several challenges:
- Disruption to train operations: Installing new turnouts requires closures or significant interruptions to railway operations.
 - Complex engineering: Projects like this requires a high level of expertise. Short preparation time can lead to budget overshoot and unexpected dis-ruptions.
 - Sensitive logistics: Vehicles are often moved unnecessarily or trapped during track removal. Also, lifting large turnouts can be a risk to other installations.
 - Safety risks: Installing turnouts can expose workers to risk. Proper safety measures must be put in place.
 



